Building Integration Projects


Central Laboratory Trane Tracer/Summit Integration

Client:              
Central Laboratory - Commonwealth of Kentucky
Frankfort, Kentucky

Present Status:
Completed 2012

This project involved providing building integration to the existing Trane Tracer/Summit automation system.  The scope included the BACnet integration of approximately 800 points to allow point monitoring, trending, and alarming.

In addition, three hundred and fifty five (355) Trane Tracer VAV box controllers were integrated and exposed onto the customer’s BACnet network.  This integration provided complete programming control of the existing Tracer VAV controllers, and provided the client the ability to schedule, trend, alarm and lock/override all of the VAV controller points.


 

Anderson County Middle Johnson Controls Metasys Integration

Client:              
Anderson County Board of Education
Lawrenceburg, Kentucky

Present Status:
Completed 2013

This project involved a complete integration of an existing Johnson Controls, Inc. Metasys building automation system.  The scope included integrating and controlling over 75 water sources heat pumps that are being controlled with Metasys N2 UNT controllers.  The client has complete control of the UNT controllers, including scheduling, trending, alarming and locking/overriding points.
 


Highland Elementary Honeywell Integration

Client:              
Glasgow Independent Schools
Glasgow, Kentucky

Present Status:
Completed 2012

This project involved a complete integration of an existing Honeywell. building automation system.  The scope included integrating and controlling over 50 water sources heat pumps that are being controlled with Honeywell LonMark controllers.  The client has complete control of the LON based controllers, including scheduling, trending, alarming and locking/overriding points.